Everything was coming to a close with the site, the plants are in, the structures are completely done. We were planning on being finished last Wednesday, the water feature got painted, tested and it works!



A few minor adjustments here and there, but it works, and works beautifully. We somehow have been very lucky with the weather so far, the days have been sunny, and if not really warm, not very cold either. Great for doing construction and getting projects done quickly. By the time we were finished last Wednesday the plan was only to work a half day Thursday to get some of the final cleanup and details done.



Thursday, however, had different plans for us. 
We woke up to rain. Hard rain, and wind as well. Tentatively I dressed in rain gear and headed down with everyone while we started the last projects, cleaned up and moved trash off the site and out of our shop/garage. As the morning went on the rain didn't let up though, lightning and thunder rolled in and parked on top of the island, splitting the sky with light and sound every ten minutes.



By late morning torrential, apocalyptic and dangerous rain started. I've never seen rain and hail like that before. Within minutes the road and gutters were like rivers dumping water into a completely overrun drain at the bottom of the hill. On the site water pooled in the plaza immediately and dirt from the planting beds washed down into the gravel pathways. We took shelter in the garage and under the covered structure and soon the staff called it a day. It would have been dangerous and stupid to attempt to keep working in weather like that.


Through the day the storm never really went away, the rain would let up from time to time but lighting and thunder continued into the night. That evening the power was knocked out at the apartments, and as the official representative of the boonies in the program I went around to each apartment leaving candles and warning about the "1 flush rule". 

The walk down to dinner in the hospital was memorable and terrifying. Straight out of Shutter Island at this point walking between the dark buildings to the dining hall. 

"If lightning lights up figures wandering slowly toward us, I'm turning tail and running" one guy said. 
"I'll be right there with you." I agreed. 

Friday morning I was afraid to go to the site, the damage could have been really bad, and I didn't want to spend the weekend fixing it. Luckily there wasn't much damage, some washout from the planting beds and there was a large puddle at the front of the water feature that we would have to dig a trench and lay a new drainage pipe to fix. Digging the trench stabbed a my heart a little, the area was finished and seeing it completed and checked off the list then ripping it up hurts. Physically hurts. I've had to do it only a few times, but each time a little bit of your soul dies. I pulled out the plants we had put in the day before, under a few inches of water and moved them to higher ground, then we dug out a trench that will house the piping along the side of the water feature and under the boardwalk to the perf pipe on the other side that leads to the main drain.



 Other than that everything seemed to be fine, our structures handled the wind, the water feature was full to the brim with rain that will have to be taken out so the mosaic can be cleaned and a couple other little things like that.

---

Most people went away for the weekend, but I wanted to stay and say goodbye to the island. On the free days I hiked a little to a part I'd never been, went back to my favorite coffee shops, and read in the sunshine in Rab for a short time. The island has become home, a temporary home for sure. But home none the less. Preparing emotionally to leave it and probably never come back isn't easy. Rab has a very unique culture to it, one I don't always understand, but it is charming.

I have met some wonderful people here on Rab, not to mention falling in love with the participants in the program. It's hard to think how unlikely it is that we will ever be in the same room again. Never again will I wake up and say good morning to my roommate, or ride into town in Luka's gigantic lime green van aka " The Candy Machine," or walk down to the dining hall arm in arm with Theresa, Patrick, Mark, or Sean.

Right now, everyone is coming up to get their clothes that we just wheeled back up from the laundry room, sorted and organized. The girls usually pick through the clothes first, generally there is an exclamation or two of: "I can't find my leggings!"
I hear Winterbottom coming up the stairwell making Luka and Carl laugh along behind him, figuring out plans for our final goodbye dinner. Even though it's just the workings of laundry day, it makes me sad to think that it will never happen again. I'd better enjoy it while I've got it.

I wonder if it's because back at home in 'real life' big changes like this happen more gradually when they are less formalized. Here, there is a tangible day when it will all be over. This great experiment will be done and I'll only have memories and pictures and a completed park half a world away to prove that it happened.

Every moment is precious.

Especially this one.

Tuesday, November 27, 2012

The Beginning of the End: Last Construction

Here we are at week 8...*le sigh*


Tuesday was my birthday and along with a wonderful googley-eye-glasses wake up from my roommate, my fellows planned an executed a surprise party for me at the Lavender Palace, complete with toilette paper streamers, balloons and impromptu dance lessons. I felt very celebrated cared for. Also last week was Thanksgiving and we asked the kitchen staff if they could cook us a turkey, then we each made our own dishes and brought them down to the dining hall for dinner. We had almost all the students, faculty, and even our favorite volunteer from the job site come to the meal. There was lots of hugging, laughing and thankfulness. With dessert (and my specialty chocolate banana cream pie), mulled wine and eggnog.
All in all it was a warm and fuzzy kind of week.


I'm sorry my friends at home, I love you, but I really don't want to leave. The project is coming together, it's at a point of completion where I want to hang out in it all the time (and so do the patients). The paving is finished, the stone walls have been finished for quite awhile now. We just put the mosaic in the water feature (and I put in an octopus, yay!)



 the dirt for the planting beds arrived and we planted the two main beds today, right now the big project is helping weld the metal pieces for the structure and putting up the columns, beams, rafters etc.



I'm enjoying watching the last major features on the site get finished, the structure and the water feature. The structure is two structures, a smaller, completely covered one on the middle level of the seating area and a very very large arbor on the upper seating area that covers the entire upper paved area. We treated all the wood with preservative this week in preparation for putting it up this weekend.

That's me with a drill - be proud Mom!
We poured the concrete footings for the structures a million years ago. Since we poured them a lot about the structures has changed because of materials, budget, comments from a structural engineer, Vesna and various other reason. But since we have these footings already we had to make them work and found a way, sometimes designing as we went. The columns were put up a few days ago, set into the post anchors (the metal cradles stuck in the concrete) made level and held in with support boards until they were bolted into place. Then with the help of ladders and scaffolding and a few strong people we put up the 6"x6" beams and sandwich beams and bolted them to the columns, then put the thinner rafters on in the other direction, then sheeting boards, then waterproofing fabric and metal sheeting.

Watching the process is really interesting. I saw four thick pieces of wood become the outline of a cube, then something more or less like a jungle gym, then obviously a structure, then a finished structure. All over the course of a couple days.



The structures look awesome, and with their profile on site it's beginning to look finished. We are still working hard but there are fewer jobs to do as one by one projects get completed. It's exciting, to watch it all come together, now just last details and cleanup type work is left (and making sure the water feature actually works. We'll see that one tomorrow.)



Next week we have the dedication, which will be some kind of ceremony involving some big-wigs from the hospital, a ribbon cutting, slide show, and maybe a performance in the site. After that we are off to Split and Zagreb for the final leg of our journey.
In two weeks I'll be on a plane home.


Caitlin's Chocolate Banana Cream Pie:

You need:
A pie plate
Cinnamon Graham Crackers,
1 1/2 sticks butter,
chocolate bars/ baker's chocolate(but with lots of powdered sugar)
bananas,
vanilla pudding, (sugar, mix, milk)
1 cup heavy whipping cream,
A few handfuls of powdered sugar
a little vanilla

- Crush graham crackers in a bowl into crumbs, - melt down the butter and add to crumbs and mix until all are coated and sticky,
-Press the crumbs/butter into the pie dish making a thin layer on the bottom and up the sides to the edge -put in freezer
-Make the pudding as directed, or if you are even more awesome and have time, from scratch.  - set aside to firm up a bit.
-Melt the chocolate with a little bit of cream and spread it onto the now firm crust
-Slice a banana and set the pieces into the chocolate
-Pour the pudding over the bananas and chocolate, smooth it out,
-Add powdered sugar, vanilla and cream and whip it! A lot! Until the "stiff peaks" form and you've got whipped cream but stop before you get butter.
-Scoop it out on top of the pudding, smooth it, make it pretty, clean the edges of the pie plate and let it set in the fridge for awhile before eating.
(you can also add more bananas to the top with drizzled chocolate on top)
-Eat your sweet banana deliciousness, sharing encouraged but not required ;)

Sunday, November 4, 2012

The Simple, Yet Mystifying Construction Experience



The class has been in the construction phase of the project for about two weeks. In the way things played out I was one of the first people to be on the site all day, and I've seen the process from the very beginning from laying out strings and measuring to pouring concrete, to where we are today about halfway through. I feel like even in this limited amount of time I have learned a significant amount about what it takes to turn a 2D drawing into a 3D reality. And here is some of that sage wisdom.

1) Having all the measurements of a design before you start building is really helpful. There is a certain amount of fixing in the field that I thing happens on any site, but really having nailed down the first time is a plus.

2) There is going to be a lot of shoveling. Dirt, gravel, crushed rock, sand, different colored gravel etc.

Yay shoveling!


3) Wafer cookies are absolutely necessary for a productive work environment. We buy them in a square foot package.

4) Gloves, wheelbarrows, even shovels cannot be precious. I've already gone through three pairs of gloves. One wheelbarrow popped a tire, the frame of another gave up after about the 1000th load of concrete.

5) Concrete, or at least the type we use is 12 scoops gravel + 6 scoops cement, with a splash of water and a cherry on top.

6) As far as I know the hole that a footing is without concrete is just a hole.

7) Once you put concrete in the hole with the intention of building something above it, it becomes a footing.

8) The metal part that holds the wooden post off the ground, away from the concrete/soil/moisture is called a post anchor.

9) Sawdust is the most heavenly smelling thing on a construction site.

10) Try to keep anything wooden off the ground so it won't come in contact with standing water and rot.

11) If a former patient who is now a maintenance guy invites you to his lair..(ahem) workshop to drink homemade Rakia, just say no. A lot.

12) If you crush a finger under a stone while building a wall, swearing loudly WILL make it feel better. Mythbusters proved it.



13) Wearing a tool belt with tools in it, even if you don't know how to use them all will make you feel like a badass. Knowing how to use them makes you an actual badass.

14) Don't breathe cement.

15) When your professor asks you to figure out the square footage of something, don't give him the linear feet. You will feel like a damn fool.

16) Curved structures, walls, boardwalks, plazas are WAY harder to figure out how to build than rectangular or linear structures. Curves are awesome and look very cool, but man, do they create a lot of issues in the field.

The design has a central circular paved plaza, to the right set into the hill is terraced stone seating with a larger upper paved area that will be under one a covered structure we have yet to start. A boardwalk will curve around the other side of the plaza meeting the seating area, also between the boardwalk and the plaza is a water feature. That's the simple version.
 We dug out pretty much everything with a backhoe, shoveled crushed rock into it and stomped it down. Then built the stone walls, poured concrete for the plaza, water feature and upper covered area. Then got most of the paving done in the plaza and and upper covered area.

We have a few volunteers that are very high functioning patients from the hospital. They are helping us as part of their occupational therapy so most of them have backgrounds in masonry and construction. For the most part they have been extremely helpful; they have built almost all of the stone steps in the seating area, a feat better left to professionals for sure. They show up in the morning, around the time we finish setting up, work hard and diligently all day and produce beautiful results. The work, they say (and I'm paraphrasing) gives them something singular to focus on, the only thing to worry about is exactly where to put the rock to make it fit. I'm pretty sure all of these guys are here for PTSD from the war but they don't like to talk about it much. They are mostly very friendly and excited to teach us how to do the work better.

We end each day about when it starts to get dark at 5:00pm, clean up, pack up, make sure all the sharp things are put away. But I've noticed that the further we get into the project, the more dangerous the site becomes. We keep it as safe as we can but still, at this phase in the project it's not exactly a safe place to be. So another thing I've learned is that construction, by nature is just plain dangerous. No one has gotten seriously hurt beyond a few squished fingers and some hauling soreness, focus is so incredibly important a second's inattention could have disastrous results.

With the stone and concrete more or less finished we have started moving into carpentry. The part I may be the most excited about, and I'm not going to lie, it's mostly because we get to use hammers. Now just hear me out about this. Hammers are one of the required tools we had to bring with us. Most people didn't bring them and bought them here instead. I however packed, schlepped on an airplane, hauled and lovingly carried my entire tool belt to the site every day since construction started. I need to use this freaking heavy piece of equipment.

We started building the forms for the concrete walls in the water feature this week; they are built out of plywood and boards and will act as a mold when we pour the concrete over the rebar. At the end we should have a beautiful set of walls. And I got to use my hammer, so I'm happy.

Aside from the forms, the boardwalk is starting to take shape, though it's held together with gigantic screws instead of nails. We have the vertical posts in, on top of which will go the horizontal beams, then the I guess z direction joists that connect the beams, with the boards on top of that. (woot vocabulary).

All in all, it's coming together, slowly but surely. We passed the halfway point this week and have five weeks left of construction, with one at the end for travel. I'm getting a little nervous though, the famous winds we've been hearing about started last week and have only gotten stronger. We took one morning off and Daniel gave lectures instead; but we can't substitute for construction every time there is a strong wind or we'll never finish the project. We might just be braving it in the end though.

This weekend we head on our longest road trip thus far to Osijek and Vukovar, and the weekend after is a wonderful surprise!

Monday, October 22, 2012

Hell Week: Starting Construction plus Adventures in Trespassing

Dead week, hell week, the week of eternal doom. This is an event of many names. The frustrations and sleeplessness are legendary among students and those working on deadlines everywhere. And it seems it has also followed us to Croatia.

After our review on Friday, Vesna and her team looked over all the designs, weighed pros and cons and picked the base design to build the final from - and it was my group's! There were a few parts she didn't like, and parts from other designs that she wanted added but it was nice to know we had been on the right track in our vision for the site.

After our lovely weekend dancing and hiking in Zadar, the groups were re-configured for the next part of the process - details. There is a group for stonework, the water feature, boardwalk, shelter structure and design synthesis which is my group. Our job was to re-design the area that will be built to better match what Vesna wants  in the final, work everyone else's designs into the final and eventually produce a master plan.

The first day or so the some of the other groups didn't all have a lot to do while we were figuring out the final, while we were designing and problem solving as fast as possible. Now that we were down to detail level decisions seemed so much more important and impacting that we really had to do it right. EXACTLY where the entrance will be, how the boardwalk curves into the plaza and how the water feature works into all of that without having awkward dead space. Then the other groups got into full swing and had to furiously get the detail work down on paper or CAD so we can transcribe them into the real world.

But because of the nature of the time limit of design/ build projects we were under a crazy time crunch. For example the arborist came on Tuesday and we had to know exactly which trees needed to go so the maintenance guys could cut them on Wednesday. Then Thursday the excavator started cutting the foundations and leveling our seating area. We had to get the footings for the structure poured and the crushed rock ready for the rock walls on Friday because the stone masons were coming to teach us to do walls on Saturday.

We had to work as fast as we could to even have measurements to have locations to tell the guy with the machine where to put the dirt. In some cases we were still designing the next area while the excavator finished up the previous area. It was, in a word, exhausting. Fun, challenging, certainly enlightening and also extremely exhausting.

I really enjoyed being out working on the site trying to pick up as much knowledge about actual construction as possible. Luka, our amazing artist, consultant, landscape architect and translator let me come along when he met with the arborist so I could learn to tell which trees should be taken down and why. Then the next day I was there to see how they took the trees down while damaging the standing ones as little as possible. When the trunks were crashing down to the earth it struck me that this is real, this design is no longer theoretical and it's coming true one way or another. We are severely altering the landscape for our design because the hospital believes in us. And it's a little intimidating.

Friday and Saturday I was out at the site all day, first moving dirt from point A to point B then setting in the casings for the footings and putting a lot of the dirt from point B back to point A. A lot of the construction process as far I as I can tell seems to be moving material around and changing the form. Turn a pile of rocks into a stone wall, a hole into a casing into a hole full of concrete. More than anything its a lot of shoveling, shoveling a wide variety of things, dirt, crushed rock, gravel, in a variety of different combinations.

Friday evening the stonemasons came, had dinner with us and we had an impromptu party out on the decks of one of the apartments. Most of them were really nice and excited to talk about their art but one who managed to keep pulling me into his conversation only wanted to talk about how the US has ruined the world, how all of our systems are f-ed up, our people are lazy and medicated and expected us to explain or try to defend things that the U.S. did before we were even born. And he also managed to casually explain to me that I'm fat and should work out more. He considered himself an intellectual. I considered him a sociopath.
I was torn here, because I should have told him to go to hell and push him off the balcony. But the greater us needed him and his friends for the good of the program. If they left angry because I beat up/screamed at/murdered their friend everyone would suffer and the consequences probably would have been worse than I wanted to deal with.
So, anticlimactically I kept more or less a cool head, said "Fuck you. I'm beautiful." and left.

The next day I of course was put in a group with him to build a wall and I did my best to ignore him and only say something when I absolutely had to. In this manner most of the day passed focusing intently on the slow-mo tetris, and with 26 people building we got a lot of the walls almost finished by four or so.

----

If we were a spectacle before when we were just walking around and taking notes we certainly are more of one now. The site is completely ripped up, mostly dirt with a dump truck arriving a few times a day leaving us giant piles of stone, gravel, and crushed rock. Some of us are making walls, others are shoveling, and still others who are getting their details finished are moving around us finding tangents of curves to figure out where their team's features go.

A lot of patients are coming to check out the construction, they usually just stand at the nearby road in their pajamas and stare. Every so often one will wander into the site and we awkwardly wheelbarrow around them. Sometimes they try to help and shovel a few scoops then go away. They are harmless, at least none of them have caused any problems. The only continually annoying thing is at least once a day a guy will wander over to where I'm shoveling or hauling or digging and tell me to "-Stop. That is a job for a man." Again, ignoring is the best way to deal with it, most of them don't know enough English to understand a half hour long rant on why I'm capable of work, and can do it just as well or as fast as most men. There is also the whole cultural difference of gender roles argument blah blah blah. It doesn't make me feel any better about it.

Sunday was our first completely free day, several people rented bikes to explore the island, others went to an optional drawing class in town. I took the opportunity to sleep in (8:00 yay!) and try to go for a hike. A friend came with me to explore where our road goes. Turns out it's through a valley with a mansion on the hill then into an oak forest up to a house with olive terraces. Apparently the road goes further but it looked like it just ended so we went back. Along the way we followed what was either a path or a drainage ditch along a terrace field until it got too grown over and we hopped up the wall into the field. I think it was a vineyard at one time, tiny grape plants were losing against stronger bushes and grasses taking back the land. We hopped another ditch, then a stone fence then a barbed wire fence into a narrow valley until our path truly ended at a wall with forest on the other side.


Our adventure was fun, in part because we were probably not supposed to be there, but we kept our ears perked and eyes up in case any angry farmers showed up. None did, but in one field without much cover I smelled cigarette smoke on the breeze. With no one else in sight that was enough to make me high-tail it back to the road before we disappeared into the Croatian wilderness never to be heard from again.

The rest of the day we spent in Rab, intending on doing some errands, but everything closes on Sunday except for one gelato place and the tourist shops. So I walked around and stumbled across most romantic spot in Rab.